City East campus network outages

Work is underway to create a seamless, secure, and scalable network for Adelaide University. To support this, upgrades will be taking place between 23 September and 3 October 2025 on the UniSA City East Campus network, aligning it with Adelaide University’s system. This work is essential to ensure consistent, modern, and high-performing connectivity across both institutions. During the upgrade, network access including internet, email, printing, OneDrive, and shared drives will be temporarily unavailable in each building. The building management system will also be impacted, affecting alerting systems (e.g. freezer temperature alerts).  

Between September and October, six buildings at City East will be migrated to the new network. While these upgrades are necessary, they will involve planned outages during the migration period for each building. The project team is working closely with key staff to schedule migrations at the most suitable times and to minimise disruption. 

What does this mean for me? 

Between 9am and 5pm on the scheduled date of migration of your building, there will be no access to the network – including internet, OneDrive, email, and shared drives. The below table provides the dates in which each building will be impacted. The building management system will also be impacted, affecting alerting systems (e.g. freezer temperature alerts).  

You may also experience temporary interruptions to your connectivity during the broader migration period. 

After migration, you’ll benefit from faster, more reliable network performance. 

Date 

Building / Room Name 

Notes 

23 September (Tuesday) 

Centenary / A Building 

Between 8 AM and 6 PM 

GP Clinic (Centenary Building) from 6 PM 

24 September (Wednesday) 

AV upgrade in C4-08, C6-26 

Between 8 AM and 6 PM 

26 September (Friday) 

Bonython Building 

Between 8 AM and 6 PM 

 

27 September (Saturday) 

Upgrade AV in BJ3-03 

Between 8 AM and 6 PM 

29 September (Monday) 

Brookman 

Between 8 AM and 6 PM 

01 October (Wednesday) 

Playford 

Between 8 AM and 6 PM 

03 October (Friday) 

Hetzel 

Between 8 AM and 6 PM 

What do I need to do? 

  • Be aware of when your building is scheduled for migration.  
  • Plan your work around any known outage periods to minimise disruption. 
  • Plan to work from an alternative workspace, or from home if possible. 
  • After migration, simply resume using the network as usual. 